Steel fabrication, repairs and replacement on mine sites and in shutdown windows. The work is scoped backwards from the window you have, because on a shutdown the date is the specification.

The Work

On A Shutdown, The Date Is The Specification.

Ordinary fabrication is quoted on scope. Shutdown work is quoted on scope and a hard stop, because the plant starts again whether the steel is finished or not. That changes how a job is planned: as much as possible gets fabricated before the window opens, so the hours on site are spent installing rather than measuring, cutting and waiting on material.

  • Chute, ledge and liner support steel
  • Wear plate and structural replacement
  • Access platforms, walkways and handrail
  • Plant frames, supports and pedestals
  • Cracked and corroded member repairs
  • Guarding, covers and safety steel
  • Lifting frames and handling equipment
  • Spares fabricated ahead of the window

Confined space, working at height and hot works are the normal conditions rather than the exception, so they are priced and planned in rather than discovered on the day. See mobile welding for on-site welding and industrial fabrication for the shop side.

A gusseted steel billet ledge fitted over a chute opening in a confined space, lit by torchlight
Billet ledge, fitted over a chute opening in a confined space.

How It Runs

Planned Backwards From The Window.

The sequence below starts well before the shutdown, because that is where a shutdown is actually won or lost. By the time the plant stops, the steel should already exist.

  1. 1. Scope while the plant is still running

    Photos, drawings and a measure-up before the window, so the fabrication can start early. Anything we can measure hot, we measure hot.

  2. 2. Written quote against the dates

    What is fabricated beforehand, what happens inside the window, and what has to be decided by when. Quotes back within 48 hours.

  3. 3. Fabricate ahead of time

    Built and fitted up in the workshop, and where the fit is uncertain, built with adjustment in it rather than assuming the measure was perfect.

  4. 4. Paperwork before mobilising

    Inductions, permits, JSAs, isolations and lift plans sorted before the window rather than during it. Tell us your site's requirements early.

  5. 5. Install inside the window

    Nights and weekends where the window demands it, with the crew sized to the hours available rather than to the cheapest quote.

  6. 6. Hand back ready to start

    Cleaned up, coatings made good where they were burnt off, walked through with your supervisor, documentation on request.

Your Side Of It

What We Need From You.

None of this has to be sorted before you enquire. But on shutdown work the detail that surfaces late is the one that costs a night, so the earlier we know, the tighter the quote.

  • The dates, and how hard they are

    When the window opens and closes, and whether it can move. It changes the crew, the shifts and how much gets fabricated up front.

  • Site and induction requirements

    Which inductions, tickets and permits your site requires, and how long they take to obtain. This is the most common cause of a late start.

  • Access to the work

    Height, confined space, live plant nearby, and what lifting is available. It determines the crew, the gear and the method.

  • Drawings or the part that failed

    Existing drawings if they exist, and photos if they do not. A photo of the failed component is often more useful than the original drawing.

  • Who signs it off

    Whether the repair needs engineering sign-off, and who inspects before the plant restarts. We will tell you if we think it does.

  • Paperwork you need back

    We are fully insured and licensed. Insurance certificates, material and welding documentation are available on request.

Who It's For

Who This Suits.

Maintenance planners and superintendents

Steel scopes that have to land inside a planned shutdown, quoted against the dates rather than against an open timeframe.

Mining and processing contractors

Overflow fabrication and on-site steel crews when your own shop is already committed. See skilled labour hire.

Regional and remote sites

Work across Western Australia, fabricated in Perth and transported, which is usually cheaper than fabricating on a remote site.

Related work and services

Mining and shutdown work travels across Western Australia, including regional and remote sites. See the areas we cover.

Proof

Work Like This.

Our own photographs, on our own jobs. Each one describes what is in the picture and what work of that type takes.

A gusseted steel billet ledge fitted over a chute opening in a confined space, lit by torchlight

Industrial

Billet Ledge

A billet ledge with hardened steel billets welded on as wear protection, keeping material moving through the chute. Fitted in a confined space with a torch for light.

A welded and drilled steel plate fitted between the drawbar members of a custom trailer hitch

Custom Metalwork

Custom Trailer Hitch

A plate welded and drilled into the drawbar members of a custom trailer hitch, photographed mid-fabrication with the clamps still on it.

See all our work

Where

Mining Fabrication And Shutdown Maintenance Across WA

Shutdown work takes us out of Perth: mine sites and processing plants across Western Australia, on the dates the shutdown gives us. Fabrication still happens in the Perth workshop wherever it can, because a part made and checked before mobilisation is a part that cannot hold up the window.

More on what changes by region:

Questions

Straight Answers.

Can you work inside a fixed shutdown window?

Yes, and the job is scoped backwards from it. As much as possible is fabricated before the window opens, so the hours on site are spent installing rather than measuring, cutting and waiting on material.

When should we get you involved?

While the plant is still running. Photos, drawings and a measure-up before the window let the fabrication start early, and anything we can measure hot, we measure hot.

Do you travel to regional and remote WA sites?

Yes, across Western Australia. The steel is fabricated in Perth and transported, which is usually cheaper than fabricating on a remote site.

Do you work at height and in confined spaces?

Confined space, working at height and hot works are the normal conditions on this work rather than the exception, so they are priced and planned in rather than discovered on the day.

What has to be sorted before you mobilise?

Inductions, permits, JSAs, isolations and lift plans, all before the window rather than during it. Site induction lead time is the most common cause of a late start, so tell us your requirements early.

Next Step

Got a shutdown window to plan steel around?

Tell us the dates and what has to be done inside them. You'll get a written quote with a description of works and a realistic timeframe.