What We Do

Steel Installation And Erection In Perth

Professional erection and installation for residential, commercial and industrial projects, coordinated around your site program, and carried out by the same crew that fabricated the steel, so nothing gets lost between the shop and the site.

The Work

Installed By The People Who Built It.

Fabrication is half the job. The other half is a crew that turns up on the agreed day, sets the steel out to the right levels, gets it into place through whatever access the site actually has, and leaves the job tidy. Because our own crew erects what our own workshop fabricated, an adjustment on site is handled on the spot rather than becoming a fortnight of emails between a fabricator and an installer.

  • Setting out, levels and packing
  • Beams and lintels into existing structures
  • Portal frame and mezzanine erection
  • Stairs, platforms, walkways and handrails
  • Bolted connections and on-site welding
  • Hand-over walk-through before we leave

Lifting and access equipment is confirmed with the quote rather than assumed, so you know before the day who is arranging the crane, the telehandler, the EWP and traffic management.

Ask us for the crew's tickets and we'll send them through, so you can check them against your site requirements before we arrive. Install-only work on steel fabricated by someone else is worth a conversation. Tell us what you have and we'll tell you straight.

A galvanised steel access platform and walkway canopy frame installed in the laneway between two industrial units
Access platform and walkway canopy, installed between two industrial units.

How It Runs

An Install Day That Doesn't Surprise Anyone.

  1. 1. Site inspection

    We attend site, take proper measurements and confirm access, connections and how the steel will be lifted into place, before anything is fabricated.

  2. 2. Quote and install date

    A written quote with a description of works and an install date that fits your program, so you can book the trades either side of us.

  3. 3. Pre-start confirmation

    We confirm the site is ready for us: footings cured, area clear, access as discussed. We reconfirm the lift the week of the install.

  4. 4. Install

    Our crew installs on the agreed date, sets out and levels, makes the connections, and works in around the other trades on site.

  5. 5. Tidy up and sign-off

    The crew tidies up and walks the job with you before we leave, so anything you want adjusted is raised while we're still there.

  6. 6. Paperwork

    Insurance certificates, welding documentation and site safety paperwork on request. Tell us what your site needs and when.

The full five-step process covers the fabrication side of the same job, and structural steel fabrication is where most installs start.

Your Side Of It

What We Need From You.

An install goes wrong for boring reasons: the slab wasn't ready, the crane had nowhere to stand, or nobody mentioned the site shuts at two. This is the list we work through with you.

  • Drawings and connection details

    Engineering drawings if the job has them, and confirmation of how the steel connects to what is already there.

  • A site that's ready

    Footings and slabs poured and cured, supporting structure in place, and the install area clear of other trades and stored material.

  • Access and a standing area

    Gate and driveway widths, overhead powerlines, soft ground, and somewhere a truck and lifting equipment can legally stand.

  • Site rules and hours

    Inductions, sign-in, permitted working hours, noise restrictions and any hot works permit process, so the crew arrives with the right paperwork.

  • A program, not just a date

    What happens immediately before and after us. If the date moves, tell us early and we'll re-sequence rather than sit on it.

  • Who's contracting us

    Builder, owner or head contractor. We are fully insured and licensed. Certificates on request.

Who It's For

Who This Suits.

Builders on a program

A crane booked for Tuesday and steel that turns up Thursday is the expensive version of this job. We work to your program, not ours.

Industrial and plant sites

Platforms, walkways and structural repairs in live facilities, worked around production and restricted access. See industrial projects.

Homeowners and renovators

Beams into existing walls, patio and carport frames, and jobs where the access is a side gate. See residential steelwork.

Anyone running mobile plant

Wear plate, bucket and structural repairs on dozers, excavators, skid steers and loaders, in the field or the workshop. See mobile plant.

Installations we've done

Install crews travel across Western Australia. see the areas we cover.

Proof

Work Like This.

Our own photographs, on our own jobs. Each one describes what is in the picture and what work of that type takes.

A galvanised steel mezzanine platform and walkway canopy frame installed in the laneway between two industrial units

Industrial

Access Platform & Walkway

A galvanised access platform with mesh decking and tubular handrails, plus a covered walkway frame, built into the working laneway between two industrial units.

A galvanised steel switchback stair with checker-plate treads installed against a weathered heritage brick wall

Commercial

Galvanised Access Stair

A switchback stair with checker-plate treads and landings, threaded up the outside of a weathered brick building in a courtyard barely wider than the stair.

See all our work

Where

Steel Installation And Erection Across Perth And WA

We erect steel across the Perth metro area and out into regional WA, on residential, commercial and industrial sites. Access is what decides most install days, and it changes completely between a CBD building with a loading dock booking sheet and a yard in the southern industrial belt you can back a truck into.

More on what changes by region:

Questions

Straight Answers.

Will you install steel that someone else fabricated?

It is worth a conversation. Tell us what you have and we'll tell you straight whether we will take it on.

Who arranges the crane, telehandler or EWP?

It is confirmed with the quote rather than assumed, so you know before the day who is arranging the lifting equipment, the access equipment and traffic management.

Can we see your crew's tickets before the install?

Ask and we'll send them through, so you can check them against your site requirements before we arrive.

What has to be ready on site before install day?

Footings and slabs poured and cured, the supporting structure in place, and the install area clear of other trades and stored material. We confirm all of that with you before the crew leaves the yard, and reconfirm the lift the week of the install.

What happens if our program date moves?

Tell us early and we'll re-sequence rather than sit on it. What we need is the program either side of us, not just the one date.

Next Step

Got an install date to hit?

Tell us the site, the access and the date. You'll get a written quote with a description of works and a realistic timeframe.

Request a Quote